Hello again, one and all! I thought, as this is the last month of building (we have been told the house may be ready in as little as 3-4 weeks!), it might be time to look back on the last few months. Following is a selection of photos from this blog that highlight the journey so far. Enjoy!
|
One page of the architect's plan, showing the front (top) and the back (bottom) of the house. |
|
The house gets marked out in string. |
|
The driveway and rock wall begin. |
|
One half of the rock wall. |
|
Stage 1 of the foundations. |
|
The concreter, working out how the hell he is supposed to concrete that much land (ha ha). |
|
Foundations, stage 2. |
|
Looking to the land, foundations, at stage 3 (gravel) |
|
Foundations, stage 3. |
|
I remember we got pretty excited when we saw this! It was finally happening! |
|
Concrete, the day after pouring. |
|
No house! |
|
The wooden frame is removed from the foundations. |
|
How's the concrete?! |
|
The wood arrives. |
|
Looked on the the local boyzzzzz... |
|
Start of the frame and scaffolding goes up. |
|
The day before most of the frame went up, these first planks were set. |
|
The frame. |
|
Mochi Maki day arrives! This was about 8.30am. |
|
One by one, the frame was put together. |
|
With big hammers... |
|
...and even bigger hammers. |
|
Some jobs were easier than others. |
|
After lunch, the frame had progressed a lot. |
|
And by sunset, it was almost complete. |
|
Getting ready to throw mochi. |
|
The first throw - this photo still makes me laugh! |
|
The house, before it got it's curtains. |
|
The frame, from the inside. |
|
Looking to the house from the garden. |
|
And from the road. |
|
The roof one day... |
|
...an the roof the next. |
|
The window frames go in. |
|
And door frames. |
|
Looking to the kitchen. |
|
Upstairs. |
|
Craftsmanship! |
|
The house gets some clothes on. |
|
Secret business. |
|
The inner lining of the walls goes on (the blue and white stuff) - the 2nd floor balcony. |
|
Our first look at the siding. Outside the kitchen window. |
|
The wood trim inside all the windows and doors. |
|
Flooring begins. |
|
And the walls and ceilings are put in. |
|
More flooring. |
|
And the longest floor. |
|
The top half of the siding goes up. |
|
And the walls continue. |
|
The siding is almost complete and the curtains are opened. |
|
Looking towards the front door from the garden. |
|
The beloved balcony. Siding almost complete. |
|
Painting the underside of the roof. |
|
Pretty house! |
|
Looking to the lounge room and my study off to the left. |
|
Looking to the Tatami room from the kitchen. |
|
Our bedroom ceiling, where the wooden fan will go. |
|
The desks and bookshelves begin. My study. |
|
Cabinet to go under the TV in the tatami room. |
|
Cabinets and shelves, upstairs sink. |
|
Kaoru's bookshelves and desk, in his study. |
|
The bookshelves for the free space being made. |
|
The stairs begin. |
|
Freespace bookshelves completed, minus the adjustable shelves which will be added. |
|
Sunrise, yesterday morning, from the tatami room. |
It has been quite a journey so far! We're really looking forward to the next few weeks (well, not the packing and moving part...).